Electric Films documented the four-year redevelopment of Parramatta City Centre using three long-term time-lapse cameras.

APAC BUILD Magazine's
"Time-Lapse Cinematography Specialist of the Year 2026"

Recognised as the 2026 Time-Lapse Specialist of the Year by BUILD Magazine.

Documenting Four Years of Construction

The Parramatta Square Redevelopment was a multi-billion-dollar urban renewal project that transformed Parramatta into Sydney's second central business district. The project was developed by the Walker Corporation and primarily constructed by the builder Built (including joint ventures with Obayashi Corporation).

Built was engaged by Walker Corporation to deliver their vision for the three-hectare masterplan for 4 Parramatta Square, followed by 3 Parramatta Square, and the last stage 6&8 Parramatta Square, having established themselves as consistently innovative problem solvers and total solution partners with each new building. As a final testament to their enduring mark on Parramatta Square, Parramatta Council also selected Built to deliver 5 Parramatta Square, the civic centre and final piece of the precinct.

Electric Films covered the project with three time-lapse cameras that were relocated several times as construction progressed to capture changing views of the site.

Each camera captured three HDR exposures every ten minutes. Over the life of the project, this produced more than two million ultra-high definition images.