88 Walker Street Monthly Progress Videos 

These monthly construction time-lapse examples from 88 Walker Street in North Sydney were filmed by Graeme Beck at Electric Films. These regular updates demonstrate how strategic camera positioning captures the structural work developing during the complex build.

88 Walker Street, North Sydney — Construction Time-Lapse Example 1

Mounting a solar-powered time-lapse camera directly to the jump form allowed us to capture the construction of multiple floors. This unique vantage point provided both a close-up look at the building process and sweeping views of Sydney Harbour.

88 Walker Street, North Sydney — Construction Time-Lapse Example 2

The roof of an adjacent building provided a vantage point for Electric Films to deploy a weighted cowling mount for a time-lapse camera. This elevated position allowed us to look down on the initial stages of construction before tilting the camera upwards to capture the new high-rise as it grew progressively taller.

 View the finished 88 Walker Street films 

What these progress examples show

Monthly progress videos are an ideal length for viewing progress on construction sites.