Construction of 88 Walker Street in Time-lapse
Navigating the tight confines of North Sydney's CBD, explore our dynamic camera positions deployed to showcase the construction of this 50-storey building.
Here, we feature two edit examples: a comprehensive 7-minute construction time-lapse, and a 40-second cut-down version.
(40-second Short Version)
(7-minute Long Edit - No Titles)
17 different time-lapse camera positions.
We scout locations beforehand to identify optimal vantage points and liaise directly with building managers to secure our systems using non-destructive weighted cowling mounts.
Additionally, we frequently utilise street power, lighting, and sometimes even parking poles to mount our time-lapse equipment. We manage all negotiations with local councils and power authorities as part of our comprehensive service.